Znojmo Hospital

Znojmo Hospital


Notice: Undefined variable: isExpired in /mnt/web-data2/morfico_cz/public_html/podlahy/templates/shaper_helixultimate/html/com_content/article/default.php on line 95

At the Znojmo hospital while refurbishing the operating rooms we used MFC Level 320 material to repair and levelling the floors of 3 mm up to 5 cm thick in one working step. All requirements for floor levelling and strength for following unstallations were met.

Total area: 1000 m2


DALSI_FOTO