Opera

Opera

At the Opera in Prague ware made terrazzo floors with binder MFC Terrazzo CP.  Applicator: Omega99 s.r.o.

Domino Park

Domino Park

In the DominoPark Brno building, the MFC Terrazzo CP binder was used to create a design floorin in the store.

The Charles de Gaulle Airport

The Charles de Gaulle Airport

The Charles de Gaulle Airport, Paris is under way the total renovation of existing floors from MFC Terrazzo CP White. Now the next stage of terrazzo floors is realized. Total area will be 7000 m2.

Carollinum Prague

Carollinum Prague

The newly renovated store network Carollinum, selling luxury watches, created floor and walls made of MFC Terrazzo CP, reaching an amazing looks of this stores. Applicator: Teraco lité s.r.o.

National Museum

National Museum

At the National Museum in Prague ware made terrazzo floors with MFC Terrazzo CP.  There was made total area of 2.000 m2 of new terrazzo floors and 700 m2 of renovation of the existing floor. Applicator: Teraco lité s.r.o

Using of Terrazzo

Using of Terrazzo

Examples of using MFC Terrazzo CP. Application company Teraco lité, Ltd.

Havlíček's Plaza

Havlíček's Plaza

At Havlicek´s Plaza building in Prague was made replica historian terrazzo floor, which was used for MFC Terrazzo CP.
Area 100m2.
Application company: Teraco lité, Ltd.

Patisserie Spork Palace

Patisserie Spork Palace

Luxury terrazzo floor with lighted crystal was made by MFC Terrazzo CP in the Spork Palace in Prague.
Area 100m2.
Application company: Teraco lité, Ltd.

Restaurant at the Colonnade

Restaurant at the Colonnade

In the Restaurant at the Colonnade in Poděbrady, terrazzo floor with a mosaic was made by MFC Terrazzo CP.
Area 100m2.
Application company: Teraco lité, Ltd.

Communal areas Apartment building

Communal areas Apartment building

Terrazzo floors with embedded mosaic were made by MFC Terrazzo CP in the communal areas of the apartment building in Londýnská street in Prague.
Area 150m2.
Application company: Teraco lité, Ltd.

Administrative building IVG BLOX

Administrative building IVG BLOX

In the administrative building IVG BLOX in Prague, white terrazzo floor was made by MFC Terrazzo CP.
Area 1500m2.
Application company: Teraco lité, Ltd.

Václav Havel Airport

Václav Havel Airport

In newly built airport terminal Havel terrazzo floor was made using MFC Terrazzo CP.
Area 500m2.
Application company: Teraco lité, Ltd

Police Presidium

Police Presidium

In the Police Presidium, terrazzo floor was made by MFC Terrazzo CP and various ornaments were created here.
Area 100m2.
Application company: Teraco lité, Ltd.

Polyfunctional House of Lomnicky

Polyfunctional House of Lomnicky

In the Polyfunctional House of Lomnicky in Prague, the MFC Terrazzo CP was used to create terrazzo floor with a marble mosaic.
The area is 300 m2.
Application company: Teraco lité, Ltd.

Car service

Car service

Coating MFC Ekopox 640 was used for treatment of existing concrete in car repair shop just to have the non-absorbent but washable surface.

Micro Terrazzo in Belarus

Micro Terrazzo in Belarus

We installed floor in restaurant in Belarussia with MFC Micro Terrazzo, material. The highlight was the esthetic solution of the restaurant.

Total area 400m2

Znojmo Hospital

Znojmo Hospital

At the Znojmo hospital while refurbishing the operating rooms we used MFC Level 320 material to repair and levelling the floors of 3 mm up to 5 cm thick in one working step. All requirements for floor levelling and strength for following unstallations were met.

Total area: 1000 m2

Dubňany High school

Dubňany High school

At the Dubňany High school due to the necessity of the fast refurbishment of floors during the summer holidays we used MFC Final 420 material in thickness of 4 cm with Kari net applied onto the wooden decking. The work was done in 4 days and flooring could be laid 7 days from the application of material MFC Final 420.

Sazka (O2) Arena

Sazka (O2) Arena

Multiple sport arena SAZKA ARENA Praha

Self levelling screed MFC Level 305 was used to level tribunes which were showing uneven levelling in range of 1 - 80 mm.

Due to the time limitation one working step was needed. The material without changes in volume was used.

MFC Level 305 proved excellent in such a difficult test.

Used material - MFC Level 305

Usage in total - 160 000 kg

Velké Opatovice Warehouse

Velké Opatovice Warehouse

While refurbushing warehouse in Velké Opatovice we applied MFC Final 410 with epoxide impregnation MFC Ekopox 630.

GU-WERK

GU-WERK

Due to the unsatisfactory levelling of the new floor with dry penetration surface the whole floor had been blasted and self levelling industrial coating followed MFC Final 413. Thus the investor requirement for levelling +-1mm for high lift stackers was uncoditionally met .

investor: GU-WERK, Nitra SK

Used product - MFC Final 413

Total area - 4300 m2

Bzenec Production shop

Bzenec Production shop

Self levelling industrial coating MFC Final 410 was used as a final surface treatment for ground surfaces in newly constructed production shop.

Investor had continued upon former good experience with our products in existing production shop in which was used the same material 5 years ago.

Used material - MFC Final 410 blue

Surface - 450 m2

Bratislava Underground garages

Bratislava Underground garages

Self levelling coating MFC Final 410 was used as a final surface treatment of condominium car garages High material quality and rolling load resistance guarantee surface long life span and minimum of maintenance.

Used material - MFC Final 410

Total area - 12 000 m2

Draka Kabely (Cables)

Draka Kabely (Cables)

In 1998 and 2001 our company had implemented   more than 15 000 m2 floor surfaces with MFC Final 410 the surface treatment in total at the Draka Kabely, s.r.o. in Velké Meziříčí in total.

There were new production and storage surfaces of one of the biggest manufacturer of cables of the group Draka Holding N.V.. 

I after more than 14 years of demanding operations the surface of MFC Final 410 provides problem free usage and almost non-ageing appearance. Thus proving remarkable resistance and life span of systems based on polymer-cement ssreeds.

Date of finishing: 1998, 2001

Photos made in 2015

Investor: Draka Kabely s.r.o., Velké Meziříčí

Used material: MFC Final 410

Area: 15 200 m2

Železné Garage

Železné Garage

In the garage of a family house in village of Železné was installed MFC Final 410 4% yellow pigment and impregnation treated MC DUR.

OC Port Chrudim

OC Port Chrudim

Department store OC Port Chrudim - installation of floor MFC Final 410 in grey color, treated MC DUR more than 800m2.

Luhačovice Family house

Luhačovice Family house

Luhačovice - a family house. Installation of 150m2 of floor. MFC Final 410 self-levelling screed tinted with 4% of black pigment.

BD Slatina (condominiums)

BD Slatina (condominiums)

MFC Level 320 was used while refurbishing the condominiums in Slatina. The existing pavement was grinded, penetrated with MFC Primer 620 and MFC Level 320 was applied.

Benešov apartment

Benešov apartment

In an Benešově appartment we applied MFC Final 410 of white cement followed by impregnation treatment MC DUR.

Jirny Castle

Jirny Castle

Materials MFC Level 340 a MFC Level 320 were applied in 5 mm to 3 cm range in one working step while restoring castle in city of Jirny by Prague.

Podveská Condominium

Podveská Condominium

There was delivered MFC Anhydrite by BREMAT technology to the construction of condominiums Podveská. More than 150 m³ of fresh mixture was processed there.

Kamechy Health center

Kamechy Health center

More than 80m3 of MFC Anhydrit 020 material was delivered to the construction of health center in Brno, Kamechy.

Kamechy Condominium

Kamechy Condominium

More than 150m2 of MFC Anhydrit 020 material was delivered to the construction of family house in Brno, Kamechy.

Francouzská Condominium

Francouzská Condominium

3000m³ of MFC Anhydrit 020 material was delivered by BREMAT technology to the Francouzská street in Brno.

Alta Vista

Alta Vista

We delivered MFC Anhydrit 020 material with Transmix technology to the street of Kociánka in Brno. There was more than 2500m2.

High School Řečkovice

High School Řečkovice

Technology Transmix was provided to the Brno Řečkovice High school. We delivered 28m3 of MFC Portland 020 cement coating.

Brodek u Konic

Brodek u Konic

We delivered 26m3 of MFC Portland 020 cement coating to Brodek u Konic construction site.

Technological park

Technological park

We delivered more than 40m3 of MFC Portland 020 cement coating to the technological park in Brno.

Brno Hospital

Brno Hospital

There was used more than 1000m2 of cement coating In Brno hospitalMFC Portland 020.

České Budějovice Warehouse

České Budějovice Warehouse

MFC Level 305 was used to level floor in the storage facility ranging from 5 to 15mm under the wear layer layer.

Penam Nitra

Penam Nitra

At Penam bakery in Nitra was restored the industrial floor with MFC Final 410 so the requirements of the investor was fully met.

Surface area 700m2.

Rajhrad Condominium

Rajhrad Condominium

More than 200 m³ of MFC Anhydrit 020 was delivered by BREMAT technology in town of Rajhrad.

Blansko Hospital

Blansko Hospital

In hospital in city of Blansko was done the floor levelling with MFC Portland 020 cast cement coating and all requirements for the future hospital operations were met.

SCONTO NÁBYTEK

SCONTO NÁBYTEK

In city of Brno we levelled floor under the wear layer floor covering with MFC level 305 thus meeting the investor requirements.

BRIT

BRIT

In 2016 in Prague we levelled surface with MFC Level 305 for laying the flooring ranging from 5 mm to 2,5 cm at the BRIT company.

Černá Hora Hotel

Černá Hora Hotel

Our company carried out the delivery of Anhydrite coating for construction of Černá Hora Hotel.

We deliverednbsp;approx 130 m3 of fresh liquid coating in total MFC Anhydrit 020. Delivery was done with use of mixing and transporting equipmentí TransMix.

Tišnov Sports and commercial center/mall

Tišnov Sports and commercial center/mall

Our company delivered anhydrite coating to the construction of Sport and shopping mall in Tišnov.

Approx.100 m3 of fresh liquid coating in total was delivered MFC Anhydrit 020 a MFC Anhydrit 030. Deliveries were done with the mobile mixing equipment. TransMix.

Rybářská Condominium

Rybářská Condominium

We delivered Transmix/Bremat technology, cast anyhdrite coating to the construction of Rybářská condominiums.

Delivery more than 100 m3 MFC Anyhdrit 020 .

Jundrov Family house

Jundrov Family house

We delivered cast coating  MFC Anhydrit 020 to the construction site of 35 family houses in Jundrov "Na Nivách". 

 

That was a developer´s project of construction of 35 family houses in that attractive locality.

Used material: MFC Anhydrit 020 

Svit premises

Svit premises

Coating MFC Final 420 was used to level base for concrete surface while refurbishing the building at the Svit facility in Zlín.

More than 40t  t of product was used MFC Final 420.

Thickness of levelling layer was in 5 - 15 mm range.

BREDA & WEINSTEIN

BREDA & WEINSTEIN

Coating MFC Level 305 was used to level the base of concrete floors at the newly constructed shopping mall in Opava.

There was used more than200 t MFC Level 305 in total.

 Thickness of levelling layer was in the range of 5 - 50 mm. 

  Advantages of MFC Level 305: levelling coating

  • minimal volume changes make application of coating possible in one working step
     
  • fast setting / hardening, wear layer in 3 - 4 hrs, light operation in 24 hrs.
  • fast coating drying gives you possibility of early final layers
  • quality surface suitable for laying the most of types wear layer flooring
Zátkovy pasta

Zátkovy pasta

At the Zátkovy pasta we laid  800 m2 floor surface with the MFC Final 400 system of self levelling industrial coating. 

We carried out the refurbishment of unsatisfactory floor surface in the warehouse on the second floor.

Used compound:
- surface blasting
- repair of local potholes and cracks 
- MFC Final 420 rough base levelling
- final surface treatment with MFC Final 410 yellow

TBP Transformers

TBP Transformers

We made 1100 m2 floor surface with the system of MFC Final 410 self levelling industrial coating.

Refurbishment of floor surface in production shops, storage facilities and hallways was carried out.

Used compound:
- surface grinding
- repair of local potholes and cracks
- base penetration with MFC Primer 620 (2x)
- final surface treatment MFC Final 410 YELLOW

ALPS Trenčín

ALPS Trenčín

In the end of 2010 we laid 2500 m2 of MFC Final 410 industrial screed at the ALPS Electric, Trenčín. 

It was repair of newly laid concrete surface with dry penetration surface se vsypem whiw were damaged by rain while repair was in progress.

Used compound:
- surface ball blasting, grinding
- MFC Primer 620 (2x) base penetration 
- final surface treatment MFC Final 410 3% WHITE

INJETON PLAST

INJETON PLAST

We refurbished the floor surface of warehouse at the INJETON PLAST s.r.o. company.

There was an area of 540 m2 of store facility area clearly broken up incl. level imperfections.

Used compound:
- surface ball blasting, milling
- repair of base cracks and joints with clips (MFC Ekopox 670)
- rough base levelling MFC Final 420
- final surface treatment MFC Final 410, natural grey

KOMA system

KOMA system

We used MFC Final 400 industrial screed system to refurbish 1352 m2 of floor surface in KOMA s.r.o. company warehouse system.

There was repair of new concrete floors with dry penetration surface. Due to the insuficient adhesion the whole area separation of mentioned surface treatment happened.

Used compound:
- base milling and blasting
- cleaning and sealing of base expansion joints
- base penetration MFC Primer 620
- local levelling of base with coating MFC Final 420
- final surface treatment with industrial coating MFC Final 410
- repair of expansion joints and their sealing with permanently flexible compound

BeF Home

BeF Home

MFC Final 400 system was used to refurbish the surface of a new concrete floor with dry penetration surface

There were approx. 1200 m2 of surface floors in a new production shop of the fireplace insert manufacturer. Concrete floor with the surface treatment "dry penetration surface" had shown some imperfections ie. whole surface separation of mentioned surface treatment along with approx. 1 - 2 cm layr of concrete.

Used compound:
- base milling and blasting
- cleaning and sealing and consolidation of base joints
- base penetration MFC Primer 620
- local base levelling with coating MFC Final 420
- final surface treatment with industrial coating MFC Final 410
- repair of expansion joints and their sealing with permanently flexible compound

Tyco Electronics Czech

Tyco Electronics Czech

In the course of Christmas holidays we refurbished floor surfaces at the Tyco Electronics Czech s.r.o. company

It was a surface repair of existing concrete surfaces in the company´s expedition ward. The existing floor surface had shown failures as lifted concrete slab edges of expansion joints (up to 15 mm max.). At the same time, most likely while the repairs were in progress the concrete slab lowered itself so the upper reinforcing steel bracket was visible. The mentioned failures highly hindered the movements of forklifts which had to operate in given shop almost continuously. The total surface area was approx. 1200 m2.


As a new surface treatment was chosen MFC Final 430, our TOP product designated for heavy duty operations.

Used compound:

- base blast cleaned
- milling of uplifted slab edges
- repair of cracks and joints of base
- base penetration MFC Primer 620
- local surface levelling with levelling coating MFC Final 420
- final surface treatment with industrial coating for heavy duty opearations MFC Final 430 v dark grey color

Tatra Kopřivnice

Tatra Kopřivnice

In the end of 2015 theAAP Hranice s.r.o. company had implemented 4000 m2 floor surfaces at the TATRA Kopřivnice company.

It was a refurbishment of existing concrete surfaces that were not meeting the requirements of planned motor vehicle service and repair shop.

Used compound:
- base blast cleaning
- MFC Primer 620 base penetration
- base levelling and consolidation with MFC Final 420
- final surface treatment with industrial coating MFC Final 410, thickness of layer approx. 5 mm

KERASERVIS

KERASERVIS

Brno´s KERASERVIS s.r.o.company had chosen in their newly constructed warehouse surface treatment MFC Final 410.

With MFC Final 400 was made 512m2 floor surfaces. The outcome was the optimal surface for forklifts and vertical stacking lifts and hand pallet stackers.

Used compound:
- base blasting
- cleaning and sealing of base expansion joints
- base penetration MFC Primer 620
- final industrial screed surface treatment MFC Final 410
- base expansion joints re-cutting and sealing with permanently flexible compound

Další reference