In the end of 2010 we laid 2500 m2 of MFC Final 410 industrial screed at the ALPS Electric, Trenčín.
It was repair of newly laid concrete surface with dry penetration surface se vsypem whiw were damaged by rain while repair was in progress.
Used compound:
- surface ball blasting, grinding
- MFC Primer 620 (2x) base penetration
- final surface treatment MFC Final 410 3% WHITE