Due to the unsatisfactory levelling of the new floor with dry penetration surface the whole floor had been blasted and self levelling industrial coating followed MFC Final 413. Thus the investor requirement for levelling +-1mm for high lift stackers was uncoditionally met .
investor: GU-WERK, Nitra SK
Used product - MFC Final 413
Total area - 4300 m2